UMB Leadership Summit 2026 — A Kansas City Corporate Event Production Case Study

Flawless Execution. Two Day Production.

In August 2026, Monarch Production Group delivered comprehensive production support for the UMB Leadership Summit at the Sheraton Kansas City Hotel at Crown Center. The two-day event welcomed approximately 400 attendees and featured multiple activations across two primary event spaces.

See the UMB Leadership Summit in Action

Inside the UMB Leadership Summit

The UMB Leadership Summit Challenge

Two Spaces, One Show, No Room for Error

UMB needed audio, video, lighting, staging, and programming to operate as one cohesive production. With the program taking place in front of the organization’s leadership team, flawless execution was paramount — every system, crew member, and production discipline needed to remain coordinated from the first presentation through the event’s closing performance.

The size of the production created significant staffing and coordination demands. Monarch also faced limited venue access, an ambitious technical scope, and areas of the event vision that still needed to be translated into actionable production plans. With multiple divisions working across two spaces, small communication gaps could quickly become show-day problems — Monarch’s responsibility extended beyond supplying equipment, to identifying those gaps, developing solutions, and bringing the complete production vision to life.

The Monarch Solution for the UMB Leadership Summit

Prepared Long Before Load-In

Preparation began well before arriving at the venue — and it showed on show day.

Production in North Kansas City, MO

3D Renderings & Preproduction

Monarch created extensive 3D renderings to visualize the spaces, align stakeholders, and guide the technical build before a single truck arrived.

Production in North Kansas City, MO

Warehouse Pre-Build & Testing

Key portions of the system were assembled and tested inside Monarch's warehouse, so the technical show was programmed and refined before load-in began.

A 28-Person Production Crew — UMB Leadership Summit 2026 case study

A 28-Person Production Crew

One coordinated crew managed audio, lighting, video, staging, and live entertainment across both event spaces, keeping every division in sync.

Full-Scale Technical Build — UMB Leadership Summit 2026 case study

Full-Scale Technical Build

More than 600 LED video panels, a multi-screen 4K presentation system, six Blackmagic Design cameras, 60+ moving lights, and a custom three-tier stage — all running as one unified production.

UMB Leadership Summit 2026, By the Numbers

By the Numbers

400

Attendees

2

Days of Programming

2

Production Spaces

600+

LED Video Panels

8

Individual LED Builds

60+

Moving Lights

6

Blackmagic Design Cameras

28

Production Crew Members

3-Tier

Custom Stage

1

Multi-Screen 4K Presentation System

Full Band

Production for Liquid Blue

The Production Services Behind the UMB Leadership Summit

Services Featured in This Production

Every one of Monarch’s core production services came together for this summit — explore the full capability behind each one.

Audio

Full audio production across two days and two spaces

Explore →

Lighting

60+ moving lights programmed and run as one system

Explore →

Video

Six Blackmagic Design cameras for live video and IMAG

Explore →

Scenic Design

600+ LED panels built into eight scenic elements

Explore →

Production Management

A 28-person crew coordinated across the full summit

Explore →

Custom / Design-Build

A custom three-tier stage built for this event alone

Explore →

Ready When You Are

Ready to Produce Your Next Event Like This One?

Whether it’s a leadership summit, an all-company meeting, or a conference in front of your board, Monarch brings the same preparation and precision to every production.